Prabowo appreciation for cabinetwork problem downstream: those who not just live

Jakarta – President Prabowo Subiantto has appreciated the performance of his cabinet on downstream development. Prabowo said the downstream project should be meant to accelerate the self -sufficiency of energy. “I think that. Brothers and sisters, I think it. Again thank you. Hilirization will continue. We will accelerate the momentum. We want to move quickly. The people are demanding, expecting quick progress,” Prabowo said in a groundbreaking opportunity for the electric vehicles in carawang, West Java, Sunday (6/29/2025). Prabowo thanks all his cabinet rankings who worked to realize the project. He asked those who did not work quickly to be left behind. Browse to continue with the content “I thank you, my team, my cabinet, everything works well. Works quickly. Those who can’t come quickly, we leave it along the way,” he said. It is known that the electrical battery-industrial ecosystem projects Integrated Antam-IBCCB Construction is an industrial development from upstream to downstream consisting of 6 (six) integrated projects that were collectively developed between PT Aneka Tambang TBK (Antam), Indonesia Battery Corporation (CBL). Where 5 (five) projects were developed in the East Halmaera FHT area and 1 (one) project was developed in Karawang. The Ecosystem Project of the Integrated Electric Vehicle Industry is part of the National Strategic Project (PSN) with an area of ​​3.023 hectares. The USD investment value project of 5.9 billion can record 8,000 direct labor, local economic growth and 18 multifunctional pier infrastructure projects. Also look at the Bahlil video: The new downstream advantage is enjoyed by the Hoegeng Awards 2025 Government Investors (Eva/KNV).