Oriental Arbitrary Railway Corridor Route Ready, logistics facilities will get better connectivity in the NCR -Eorc route -alignment finalized corridor near the eastern peripheral highway
Haryana Rail Infrastructure Development Corporation has notified the general secretary of Uttar Pradesh government of Eorc (Eastern Arbitrate Corridor) on the route alignment. The hallway will be prepared in the outside of the eastern peripheral. This corridor, about 135 km long, will go through Uttar Pradesh and Haryana. This will reduce the movement of commercial trains in Delhi. The connection of logistics will be better. Jagran correspondent, Ghaziabad. The Haryana Rail Infrastructure Development Corporation has the general secretary of the Uttar Pradesh government of Uttar Pradesh, while it was Google Earth, agreed upon to prepare the passage in the outside of the eastern peripheral. In addition, information on the population, route, rail packaging, etc. At the meeting. With the above information, GDA VC Atul Vals said that Eorc (Oriental Arbitral Rail Corridor) can be seen in the expansion of the Arbitral Railway of Haryana, which is approximately 135 km long, which is distributed to Uttar Pradesh and Haryana and by Baghpat, Ghaziabad, Gautam Budhnagar, Sonipat, Faridabad, will go. After preparing, the movement of commercial trains will stop in Delhi. Eorc’s route has been finalized. In the light of the population, the general secretary, the problem in the construction of the corridor in the city, asked HRIDC (Haryana Rail Infrastructure Development Corporation) to prepare a detailed feasibility study report after doing a detailed survey, after which it will be sent to the government. He said that during the presentation it was said at the meeting that in the light of the population there could be a problem in the construction of the corridor in the city. For this, the corridor will be prepared for the EPE Outer Mussage. Now prepared the details of this project, prepared the prepared HRIDC and instructed to prepare the detail exportability report. GDA Vice President Atul Vals said that the details of this project will now be prepared, in which complete information on the root of the Karidor will be given, after which the report will be sent to the government, where further process will begin. GDA is the nodal agency of the project. The benefits will be provided in different fields, with the erection of Eorc, the Delhi Rail route will receive good connectivity for the new Noida Industrial Township, the Agricultural Production Center Baghpat, Ghaziabad, Gautam Buddha Nagar. NCR will get better connection to different ports of industrial and logistics. Every big news from your city, now on your phone. Download the most reliable companion of Local News Afjagran Local App.