Pipa bridge connecting Bihar-Uttar Pradesh is divided into three pieces, where the effect was on rail traffic

Today, heavy storms and rain have a devastation in the border areas of Bihar and Uttar Pradesh with the entire Bihar. The cyclone disrupted Railway Services on Howrah and Pandit Deendayal Railway Divisions, while the Pantoon bridge on the Ganges River was also divided into three parts. Hurricanes and rain stagnated everywhere; People stayed where they were. In this way, rail traffic was also completely disrupted. The howrah-end deendayal railway was disrupted for one hour. It is said that traffic over Howrah and Pandit Deendayal Railway division was disrupted for one hour due to the serious storm. The operations on both up and down, one kilometer before the Tudingz station in the Buxar district, were interrupted about an hour. Due to the strong thunderstorm, a large polythene bag in fact flew and lost to the railroad thread that provided electricity, which was first disrupted. In awhile, a large polythene bag flew and lost to the power cord of the upline, which also disrupted the outline. Passenger trains went off both sides and both trains remained in the same place. All the passengers came out of the train and started seeing what happened, why did the train stop? Later, drivers from both passengers trains removed the plastic using sticks and then the train could run after an hour. The pantone bridge connecting Bihar and Uttar Pradesh is divided into three parts. The second incident happened in the Ganges River in Ara. The pantone bridge connecting Bihar and Uttar Pradesh is divided into three parts. Due to the sudden storm, not only the movement of vehicles on the roads, but the operation of the railway and the Ganges also came to a complete downtime. On the one hand, where the operation of trains on the railway line was interrupted for 1 hour, the Panton Bridge on the Ganges River on the other side was divided into three parts. As a result, people who went through the bridge also stopped. Tracking services were restored after an hour, but the pantone bridge was disrupted due to the breaking of the bridge in the Ganges River. No concrete initiative has been taken on this so far, which shares Uttar Pradesh these storytelling plates