Jakarta – Traffic jams in Ciputat in the direction of Lebak Bulus, South Jakarta, due to the excavation project took place this morning until this afternoon. It seems the rope of vehicles on Jalan IR H Juanda has thrown to the intersection of Jalan Ciputat Raya. AFP monitoring on the spot, Tuesday (8/19/2025), at 16:30 WIB, congestion took place in the same place as the morning. Vehicles should reduce velocity and take turns to cross the narrow road due to the excavation of the water pipeline project. Congestion due to the excavation project in Ciputat in the direction of Lebak Bulus at 16:30 WIB, Tuesday (8/19/2025)-(Taufiq/Detikcom) There are six excavation points distributed on Jalan Ciputat Raya. There are two excavation points at the intersection near the Lebak Bulus terminals, two front points in the hospital, two more points not far from the red lights of the intersection to Jalan Fatmawati and Pondok Indah. Browse to continue with content two dug points near the Lebak Bulus terminal is right at the intersection. Then two excavation points are near the hospital on the left side of the road to cover two lanes. Next, two excavation points are near the red light on the right and left side of the road. Drivers must delay because the path is narrowed and taking turns. Congestion gets worse than a vehicle on the shoulder of the road. A parking space around the location, Ari, said traffic jams in the area usually do not last long. “It’s not so, it’s just smooth. The afternoon is usually smooth, in the afternoon. It is also overwhelmed that it is not stuck,” Ari said. Ari said the excavation project was the culprit of traffic jams. He said the vehicle should delay due to the narrow road. “Just smooth, usually the 40s (km/hour) can be here. Now it knows at most 20, there is also a sign that is said to be slow,” Ari said. (HAF/HAF)