From the railroad tracks, the use of 15 Killovat capacity in Varanasi - Varanasi News Solar Panels on Railway Tracks at Bareka 15KW capacity
Solar panels are installed in an area of 70 meters on the railway in Bareka, which will produce electrical energy. This 15 kW capacity was inaugurated by general manager Naresh Pal Singh. It is the first in its friendly initiative in the country to use special design and installation process. Jagran correspondent Varanasi. Railways have now become active about energy savings as well as energy production. In this series, a capacity of 15 kW is produced from the solar panel laid on the 70 meter railway in Bareka. When general manager Nararsh Pal Singh inaugurated the project by cutting the side, the outline of the Light of the Indian Railways was also unveiled. Also read: At Varanasi Airport, the passenger’s part of the machine gun was stirred, and now the police investigation will also produce electrical energy from Railways. Solar panels were laid as experiment on a 70 meter track in Bareeka. This 15 kg watt capacity plant developed on line number 19 was inaugurated by the general manager Nararsh Pal Singh on Saturday by cutting the side. 🚆 Indian Railways is a historic first! Banaras Locomotive Works, Varanasi has commissioned India’s first 70 m removable solar panel system (28 panels, 15kWP) Betway Railway Tracks Green and Sustainable Rail Transport. pic.twitter.com/bcm2gtjk7o- Ministry of Railways (@railminindia) August 18, 2025 He encouraged the chief power service engineer Bhardwaj Chaudhary and his entire team for this task and encouraged him to increase his size. This technology can be adopted in Indian Railways. It is believed that more on the lines of this scheme will be done by the railways for energy savings and production. Also read: In Varanasi, the risk of water carried by water, children suffering from jaundice, the first initiative of its kind in the country, in this pilot project founded on line number 19 of Bareka Workshop, solar panels were installed in this pilot project using a special installation process designed. In this process, there was no effect on train traffic, while the panels will be easily removed if necessary. Most importantly, this innovation will further expedite the production of green energy in collaboration with Roftop solar plants already based on the Bareka campus. Also read: Malwah vessel Homi Bhabha leaves from Varanasi, which promotes water transport before installation challenges. Safety from vibrations: Rubber mounting cubes are installed to reduce the vibrations caused by the train. Strong fixation: The panels are pasted from the Epaxi sticker to the beton’s sleep, strengthening the grip of metal confrete. Neatness and maintenance: Easy cleaning system to keep panels free of dust and debris. Panels can be removed quickly: 4 SS for the maintenance of railways. Panels can be removed quickly by Alan Bolt. The most important point of technology in number games -70 m total length of the total lane. -15 kW total power capacity. -220 kWp power density. -28 Total panel panel number: 28 solar panel Features Size: 2278 × 1133 × 30 mm Weight: 31.83 kg. Also read: Tata Cancer Hospital will reduce and wait for examination and surgery in Varanasi, new facilities begin