Gangotri Highway: Gangotri Highway is plunged into an artificial lake built in Dharali 15 days
Gangotri highway was disrupted for 15 days due to the formation of artificial lake in Harshil-Dhali of Uttarkashi. The efforts of the channels failed. The water of the Bhagirathi River flows on the highway. Army machines are stuck in the swamp, which increased problems. Local people demand to repair the highway soon so that heavy machines can be delivered. Jagran correspondent, Uttarkashi, 100 meters of Gangotri Highway has been plunged into the lake in Harshil for 15 days. Over the past 15 days, 100 meters of Gangotri Highway has been brought underwater due to artificial lake built in Harshil-Dharli. Despite the work of channeling, there is no hopeful success in opening the lake. In the past, however, the water of the lake was definitely less than the work of the channel. But due to the lack of water from the Bhagirathi River flowing to the highway, vehicles and machines cannot move. Please tell that Dharali is facing a disaster on August 5, due to the flood in the Keer Ganga River. At the same time, Harshil also stands with disaster due to the artificial lake made as a result of the flow of the Bhagirathi River due to the debris due to the Cooking of the Telgad near Harsshil. Even after 15 days, about 100 meters from the Gangotri highway are underwater. Earlier, an attempt was made to open the lake with a back -to -load on behalf of the army, but the machine was drowned in the lake due to the swamp, as the army has not removed the machine again since. On the initiative of the administration, the army was requested to provide its machine again on the initiative of the administration after the water level of the lake was reduced on Saturday, and the army went here on Tuesday. However, due to the lake, there was a problem running the machine here because of the swampy country. According to the information, no special work could be done by the machine on Wednesday. As a result, the water of the river flowing through the highway did not come off due to the lake. Local people say that as soon as the Gangotri highway has been repaired, heavy machines can be delivered here. Therefore, there is a need to focus on the recovery of the highway here.