Relief from water logging at Mathura Road and India Gate, NDMC's new plan! Construction of Sampavail - NDMC to prevent water logging on Mathura Road and India Gate this year
NDMC launched a scheme to stop reconciliation from Mathura Road to India Gate. Five lakh -liter property is made on the old Fort Road, which will collect rainwater. After this, water in the yamuna is dumped into the pump. NDMC tries to eliminate the problem of weakening before the monsoon by removing technical defects. Jagran correspondent, New -Delhi. The New -Delhi Municipal Council (NDMC) has begun to solve the problem of reconciliation of Mathura Road, Pandara Road and India Gate this year in the capital Delhi capital. To solve the problem, NDMC began building a five lakh -liter capacity on Old Fort Road. If there is rain, the water will be stored in Sampavail instead of building up the road. After this, the water is poured into the drain and goes through porridge to the Yamuna. NDMC hopes it will not be weakened in the above areas. Technical defects are done. After lying the foundation stone of the sampool construction work, NDMC’s vice president Kuljit Chahal said NDMC was working to eliminate all the causes of weakening. We have already started preparations for this monsoon. Below are resources installed where there is a shortage of resources. At the same time, where there is technical error, technical defects are also removed. Below we started with the work to make the property on the old Fort Road. As a result, there will be no weakening in Mathura Road, Tilak Lane, India Gate as well as Pandara road and surrounding areas of the Supreme Court. He informed that water will be collected in Sampavail if there is heavy rain. Thereafter, water in the drainage is released by the papation station. Other drainage reforms are also working on the action plan, except that the council is also working on its other drainage improvement action plan. This includes the task of immediate and medium -term measures, such as technical evaluation of existing rainwater discharge through modern equipment, silt cleaning of identified drains and structural recovery, strengthening the pumping capability at water returns. It is noteworthy that during the rainfall last year there was in the government residence of the then Minister of Water Atathi on Mathura Road. After the Pragati Maidan project, the drainage level of the output NDMC said that the water of NDMC areas used to go to Yamuna via the drain, but in the progress land tunnel construction broke the drainage of NDMC near Matka Pir. After the tunnel, when the drainage system was re -created, the level was not matched. The drainage of the NDMC area is the lower levels, while this water reaches drainage in the area in MCD from the NDMC area, its level is high. As a result, the water does not reach the yamuna with high velocity. As a result, the water decoration takes place here. Also read: A septic tank in Delhi has become a time, a person dies after being pressed under rubble; An accident caused by tank that sinks, every major news from your city, now on your phone. Download the most reliable companion of Local News Afjagran Local App.