This will be the most expensive road of the country, one kilometer is spent Rs 411 crore
Business News Desk – The job of laying a network of roads is going on all over the country. If we talk about Maharashtra and Mumbai, then the work of the Coastal Road project, after the start of the sea link here, is underway. It will take about one year to complete the first phase of the work, but the second phase of the work has also been announced. The special thing is that the second phase of the road will be the most expensive road in the country. The reason is that about Rs 411 crore is estimated to be spent on the construction of one kilometer. Let us also tell you what kind of works will be in the second phase. The first phase of the work is underway, Brihanmumbai Municipal Corporation (BMC) prepares him to start the second phase of his Mumbai Coastal Road project (MCRP) in 2023 to connect Versova to Dahisar. Currently, phase 1 of the project and BMC is looking at the November 2023 time limit. According to BMC data, about 70 percent of the work was completed in the first phase. Phase 1, 10.58 km long, will connect Nariman Point in the southern tip of Mumbai with Bandra-Worli Sea Link (BWSL) through arterial roads, flyers and underground tunnels. The announcement of the second phase, Maharashtra State Road Development Corporation (MSRDC), is the construction of Versova Bandra Sagar Link (VBSL) of Bandra, which will facilitate the connectivity with BMC scheme to connect Dahisar and Bhayandar (Dahisar-Bhayander Link) in North Mumbai. Vala proposed to build an increased bridge and the tender for work was released in October. Phase 2 of the Coastal Road project, known as Versova-Dahisar Link Road (VDLR), starts from Versova and will expand to the initial point of Dahisar-Bhayandar Link Road in Dahisar. The work will be done in four packages, according to BMC’s blueprint, the interest of 24.29 km is divided into four packages. It is estimated that BMC will cost Rs 9.980 crore, and BMC is looking at a five -year time limit for phase 2. The first package of 4.5 km will include increased road, a basket bridge and an arterial road on the silence, which connects VBSL changer in Versova in Versova. The 7.48km second package will connect Lokhandwala to Mindspace in Goregaon and will include a cable tone and an increased road. Share this story