Indian Railways: You can sit on a train from Patna and travel Kashmir's visit, Chinab Bridge is easy to travel - you can travel by train to Kashmir -Valleia from Patna Travel.
NEGAJ KUMAR, Patna. There is good news for the dedicated people who will visit Mata Vaishno Devi of Bihar that they will now visit the litigants of Kashmir by railway. Indian Railways built a bridge over Chenab River and the Fix section and connected Srinagar, the capital of Jammu and Kashmir, to other parts of the country, including Patna. With this, dedicates will now be able to easily go to Srinagar. Tourists and dedicated across the country, including Bihar, will benefit. Railways has compiled this project called Udhampur-Srinagar-Baramulla Rail Link. The bridge over the Chenab River is located in the Reasi district. Railway officials say it is the highest railway bridge in the world. The Bridge on the Chenab River is 1.315 meters long. This bridge is 359 meters high off the river floor. The total cost of the bridge is Rs 1.486 crore. It was prepared by the Konkan Railway Corporation. In light of the next 120 years, this bridge was prepared. The bow is 550 meters. This bridge can also tolerate the storm with a velocity of 266 km / h. The construction of this bridge has 28,660 tonnes of steel. Experts from IIT ROOREKEE and IIT Delhi contributed to the construction of this bridge. Patna to Jammu, then the dedicated or tourists of Patna Junction will first go to Jammu. Then he will go from there via Chenab Bridge in Reasi to Srinagar. Tourists can go from Patna to Archana Express of Himgiri Express to Jammu. From there, tourists travel from Bharat Express to Srinagar via Chenab Bridge. After the Chenab bridge is built, tourists can travel by train from Srinagar to Rameswaram. The country’s first cable -based track bridge in Fix prepared the country’s first cable -based railway in the figs of Jammu and Kashmir. This bridge connects Katra and Reasi. This bridge is built at a height of 331 meters above the floor. The Fig bridge is 725 meters long. The 96 cables ensure stability. More than 8,200 tonnes of steel were used in its construction. The work of Udhampur-Srinagar-Baramulla Rail Link project is complete. The surrounding towns will develop from this railway. About 73 towns near the Chenab Railway Bridge are also linked to 225 km of roads. With the construction of the Chenab River Bridge, it will now be easy to visit Kashmir’s valleys and go to Srinagar. – Rajesh Khare, senior liaison officer, Northern Railway also read many trains from Bihar to Jammu Cancell, Archana Express was also included in the list; Know the changed schedule Indian Railways: Now make Srinagar plan with Vaishno Devi, this will travel out of India in 3 hours